I've been working on remodeling my bedroom for several months now, progress has sometimes been slow working for clients on the weekends, or having to redo stuff to get it perfect and also taking some days off to enjoy going out for a drive. The room is not entirely complete yet, I replaced the floating floor, I painted walls, replaced all the baseboards and door trims. I did an entire wall of floating cabinets, some of which I had to cut them up smaller and customize them. Even the hangers I fabricated. Then I needed to paint many tops, bottoms and sides. I sanded and painted my bed with metallic car paint. Another difficult project was the accents lights, I had to be creative as the remote would interfere with my bathroom lights turning both rooms off or on or half half plus they all had to be synced with another remote due to being plugged in different outlets.
Next I did another a smaller wall of floating cabinets and incorporated a section for my watch collection. I still need to replace the outlets and light switch with designer style and modern window shades. I could never of done this with my ex GF since we spent every weekend together.
